Get A Quote
  1. Home
  2. >News
  3. > Analysis of the cause of too much material in jaw crusher

Analysis of the cause of too much material in jaw crusher

Cause analysis of the crack of jaw crusher frame effect is not good The surface of the inner cavity of the mold is peeled off by foreign matters or modeling materials Slag inclusionCause of formation slag removal is not clean after refining and modification There is not enough standing time after refining and metamorphism

Get Price
Get In Touch

You can also send a message to us by this email [email protected], we will reply tu you within 24 hours.Now tell us your need,there will be more favorable prices!

Product Introduction

Crusher Bearings The Timken Company

opening allows these crushers to receive largersized material than most other types of machines Bearing speeds and loads are generally moderate but on occasion the load spikes as uncrushable material passes through the chamber In a typical jaw crusher two outer bearings located on

Oct 12 2017 That the jaw swings too much will cause severe vibration of jaw crusher In order to reduce the swing pressure of moveable jaw you can add a conveyor belt with the same size of the pad as a cushion E Strictly control incoming material specification

Jun 17 2021 1 The problem of material blockage in the crusher is that too much material feeds the equipment and the burden on the equipment increases and then causes the problem of accumulation or even material blocking This situation will cause the equipment to discharge slowly

Cause analysis of slow discharge of hydraulic cone crusher

Cause analysis of slow discharge of hydraulic cone crusher

Jul 06 2020 The cause of this phenomenon may be too much feed which causes a large amount of material in the main body of the cone crusher to block the diverter disk air duct which causes the cone crusher to s during operation At this time it is necessary to shut down and clean up in time 4 The exhaust of the pipeline is not smooth

Analysis of the reasons for avoiding the blockage of the

Jul 15 2021 On the contrary too much material will be stuck in the crushing cavity Too much water will cause rust in the cavity damage to the accessories and impurities in the finished material The content is too high so no matter it is a counterattack crusher or other crushing and sand making machines it cannot be blindly fed

Jul 07 2021 7 Excessive temperature rise in housing or movable jaw Failure cause lack of bearing oil or too much oil is injected oil hole is blocked oil cannot be added the position of the weight block of the flying wheel runs out of place and the frame jumps out axial movement of fixed bushing bearing wear or cage damage Solutions

Apr 13 2020 Reason Under normal circumstances the feed speed and discharge speed are balanced Too much feed and too fast will cause blockage If the discharge speed is too slow it will also cause a large amount of material to be blocked inside the machine Causes blockages and prevents the device from operating normally

Composition out of toleranceCauses the composition of the intermediate alloy or the pre cast alloy is uneven or the error of composition analysis is too large Charge calculation or batching weighing error The smelting operation is improper and the easily oxidized elements are burnt too much The melting and stirring are uneven and the distribution of easily segregated elements is uneven

Cause analysis of the crack of jaw crusher frame

Cause analysis of the crack of jaw crusher frame

What Are The Reasons for The Large Vibration Amplitude of

Aug 16 2021 When the equipment vibrates too much we should pay attention to this situation The occurrence of abnormal vibration indicates that there may be problems with the machine which will greatly reduce the production efficiency of the jaw crusher damage the

Jaw crusher is one of the main t ypes of primary crushers in a mine or ore processing plant The size of a jaw crusher is designated by the rectangular or square opening at the top of the jaws

Nov 25 2019 Too much load is added during the runin period while standard type cone crusher can crush materials to a relatively coarse size but it has a high output and usually used in the middle crushing process 3 Different in the discharging size which will cause the cone crusher to leak oil 3 Return hole of Ushape tile is too small

The oil temperature is too high 2 Oil temperature and pressure rise 3Oil pressure is low after oil pump is started 4Oil contain lots of fine mud and impurities 5There is water in the oil 6The vibration of cone crusher is too strong 7 The crushing cone rotates very high

Crusher Bearings The Timken Company

opening allows these crushers to receive largersized material than most other types of machines Bearing speeds and loads are generally moderate but on occasion the load spikes as uncrushable material passes through the chamber In a typical jaw crusher two outer bearings located on

Crusher Bearings The Timken Company

Crusher Bearings The Timken Company

May 06 2021 The jaw crusher discharge opening is the distance from the valley between corrugations on one jaw to the top of the mating corrugation on the other jaw The crusher discharge opening governs the size of finished material produced by the crusher Measuring Discharge Opening Measure distance at bottom of jaws at the point of the crushing cycle when the bottom of jaws is closest together

Jan 08 2020 The reasons and solutions of jaw crusher returning and not feeding after reading it it became clearYantai Qinglin Mining Machinery Co LtdThe jaw crusher parts do not match the dimensions of the drawing such as nonstandard jaw length thickness elbow length elbow angle frame cavity size etc causing poor quality machinery After longterm use the angle between the two jaw

Jun 03 2020 4 Crusher blocking due to improper feeding should pay attention to keep the feeding uniform not too much or too little Iron or other large pieces of noncrushed material that enter the crushing chamber cannot be discharged and cause the cone crusher to block the material or the feeding properties are not suitable

Cause analysis of the crack of jaw crusher frame Qiming

Feb 09 2020 The porosity and cracks on the welding frame of the jaw crusher are the main causes of frame cracking The causes of the porosity and cracks are as follows Low ambient temperatureSince the welding was in winter the tightening temperature was lower than 0 C When welding at low temperature the crack tendency increases because of the fast

Jan 01 2018 Weight of crusher jaw varies 505000 kg depending on the capacity of the crushing machine For this study the weight of each crusher jaw used was approximately 2 tons Each crushing machine uses a pair of crusher jaws weighing a total of 4 tonsEstimated cost of manganese steel is about 2000 per tons

Failure analysis of a crusher jaw ScienceDirect

Failure analysis of a crusher jaw ScienceDirect

Without this the crusher has to rely on energy and friction to crush the rock Compaction will also impose increased loads to the crusher as much as five times the normal crushing force To the oppositefeed material that is too large also affects wear life A jaw crusher in

Jul 15 2021 On the contrary too much material will be stuck in the crushing cavity Too much water will cause rust in the cavity damage to the accessories and impurities in the finished material The content is too high so no matter it is a counterattack crusher or other crushing and sand making machines it cannot be blindly fed

Analysis of the reasons for the material blocking of

Apr 13 2020 2 Reason It is easy to choke on an overdose or too fast at one time and the same is true for the impact crusher When the impact crusher feeds too much or too fast it is too late to crush and discharge causing blockage Solution During the feeding process pay attention to the deflection angle of the ammeter pointer

Cause analysis of the crack of jaw crusher frame effect is not good The surface of the inner cavity of the mold is peeled off by foreign matters or modeling materials Slag inclusionCause of formation slag removal is not clean after refining and modification There is not enough standing time after refining and metamorphism

Relevant News

Online Chat Get Quotation